Development History

  • 2008

    In 2008, Feipu was founded and cooperated with Wuhan Siemens (Energy)、 Alstom to produce 110KV and 220KV transformer oil tank.

  • 2010

    In 2010, we began to cooperate with Jinan Siemens (Energy) and Shandong Electric Power to produce 220KV and 500KV transformer oil tank and clamping.

  • 2014

    In 2014, we cooperated with Guangzhou Siemens (Energy) to produce HVDC, GSU oil tank and clamping.

  • 2020

    In 2020,  we began mass production of wind power transformer clamping and oil tank.

  • 2023

    In 2023,we began to cooperate with JinPan HaiNan, produce wind power transformer clamps and oil tanks,mass production as well

  • 2024

    In 2024, We began to cooperate with Siemens (Weiz) Austria, and exported the first oil tank.

    Produced 22 sets HVDC in 2024,key projects for the nation:

    Wudongde,Baihetan,Hami,Jinshang etc.. Shipped GSU,500KV and the other products 30units, Both production volume and output value reached a new historical record.